Vortech 2006-2010 6.1L Jeep SRT8 User Manual
Page 45

P/N: 4CK020-010 v6.0, 02/17/2012
©2012 Vortech Engineering, Inc
All Rights Reserved, Intl. Copr. Secured
35
N. Continue running the red 10ga. power wire to
the Power Distribution Center. Locate the pro-
vided fuse holder and cut the center of the
wire loop. Attach one end to the red 10ga.
power wire from FPB. Use the supplied ¼”
yellow ring terminal crimp, solder, and attach
to factory power lug. (See Fig. n) Install the
supplied 40amp fuse into fuse holder after all
connections are complete and cover the wire
with a piece of ¼” plastic split loom. (Refer to
wiring diagram).
O. Run the 1/8” instrument tube vacuum line from
the FPB to the passenger side of the engine.
Locate the supplied 7/64” vacuum hose and
cut off a 2” piece. Slide approx. 1” onto the
1/8” nylon instrument tube.
P. Using the supplied brass fitting, connect the
FPB vacuum line to the line between the MAP
sensor and bypass valve. (See Fig. o, and
Fig. p). Cover with ¼” plastic split loom and
secure with the provided tie wraps. This will
be used for boost reference.
Fig. n
Fig. p
Fig. o