Vortech 2006-2010 6.1L Jeep SRT8 User Manual

Page 47

Advertising
background image

P/N: 4CK020-010 v6.0, 02/17/2012

©2012 Vortech Engineering, Inc

All Rights Reserved, Intl. Copr. Secured

37

Q. On the FPB box locate the red 10ga. wire with

a fuse holder. Connect this wire to the 10ga.

red wire in the harness assembled back in

step I. (See Fig. d). Connect the 10ga. orange

wire from the FPB to the 12ga. orange wire in

the harness. Connect the 14ga. red wire from

the FPB to the 14ga. red wire in the harness.

Locate the 7/64 vacuum hose provided in the

kit and cut a 2” piece and install one end on

the 1/8” nylon tube and the other end to the

vacuum port on the FPB. This will be used for

boost reference. Locate the black 12ga.

ground wire from the FPB and install a ¼” ring

terminal. Using a drill with a 9/64” bit, drill a

hole and attach the black ground wire to a

suitable ground as shown in Fig. q, and r.

(Refer to wiring diagram). Install the supplied

40amp fuse into fuse holder.

R. Reassemble the subfloor and plastic trim

panel. (See Fig s)

Fig. r

Fig. q

Fig. s

Advertising