Vortech 2006-2010 6.1L Jeep SRT8 User Manual
Page 47

P/N: 4CK020-010 v6.0, 02/17/2012
©2012 Vortech Engineering, Inc
All Rights Reserved, Intl. Copr. Secured
37
Q. On the FPB box locate the red 10ga. wire with
a fuse holder. Connect this wire to the 10ga.
red wire in the harness assembled back in
step I. (See Fig. d). Connect the 10ga. orange
wire from the FPB to the 12ga. orange wire in
the harness. Connect the 14ga. red wire from
the FPB to the 14ga. red wire in the harness.
Locate the 7/64 vacuum hose provided in the
kit and cut a 2” piece and install one end on
the 1/8” nylon tube and the other end to the
vacuum port on the FPB. This will be used for
boost reference. Locate the black 12ga.
ground wire from the FPB and install a ¼” ring
terminal. Using a drill with a 9/64” bit, drill a
hole and attach the black ground wire to a
suitable ground as shown in Fig. q, and r.
(Refer to wiring diagram). Install the supplied
40amp fuse into fuse holder.
R. Reassemble the subfloor and plastic trim
panel. (See Fig s)
Fig. r
Fig. q
Fig. s