Flown disassembly – KLING & FREITAG K&F SEQUENZA 10 W User Manual

Page 32

Advertising
background image

User's manual

K&F SEQUENZA 10 N/W/B & Flying Frame

KLING & FREITAG GMBH © 2014

Version Version 6.1

Page 32 of 70

11. Flown Disassembly

1.

Basically, you disassemble the array in the reverse order of assembly.

2.

Replace each transport cover when the speakers are hanging at working level.

3.

Just before the bottom speaker
touches the ground, pull the array
in the direction of the arrow.

This way, you make sure that the
array does not stand on the side of
the bottom speaker, but rather on
the castors.

Warning

Always make sure that the chain
hoist is hanging vertically during
lowering. If you do not do this,
the array could sway suddenly.

If the system is not standing on
the castors, this could lead to
diagonal pull during further
lowering.

4.

Lower SEQUENZA 10 B arrays far enough that all systems are on the wheels, then
prepare the SEQUENZA 10 speakers for transport.

Place the used Quick Release Pins back onto their intended stand-by positions on the
speaker and flying frame.

Push all joint plates back into the speaker.

Dismantle all other used components so that they are not exposed and get damaged
during transport.

For arrays with SEQUENZA 10 N/W and a length exceeding 5m, proceed as described in
sub-section Disassembly of arrays with SEQUENZA 10 N/W exceeding a Length of 5m.

For arrays with SEQUENZA 10 N/W and a maximum length of 5m, proceed as described
in sub-section Disassembly of arrays with SEQUENZA 10 N/W and a maximum Length of
5m.

Advertising
This manual is related to the following products: