1 initial preparation and, Initial preparation and removal -1, Initial preparation and removal – Paxton Superchargers GM 8.1 HD Truck/SUV User Manual

Page 9

Advertising
background image

1-1

P/N: 4809642

©2004 Paxton Automotive

All Rights Reserved, Intl. Copr. Secured

28SEP04(4809642 v1.2)8.1GMTruck

Section 1

INITIAL PREPARATION AND REMOVAL

***NOTE***

Before performing any of these steps, note

that it is necessary to remove the refrigerant

from the air conditioning system which should

be performed by a qualified technician using a

refrigerant recycling system.

A.

Remove the refrigerant from the A/C sys-
tem.

***IMPORTANT***

Releasing refrigerant into the atmosphere is

environmentally irresponsible and should be

avoided.

B.

Drain sufficient amount of coolant to allow
for removal of the radiator reservoir drain
hose.

C.

Disconnect the negative cable at the battery.

D.

Remove all ducting between the MAF meter
and the throttle body.

E.

Remove the upper fan shroud. (If equipped
with an Allison Transmission, remove the
transmission control computer from the fan
shroud.)

F.

Remove the accessory drive belt.

G.

Remove the factory idler on the driver’s side
just below the alternator.

H.

Remove the stock belt tensioner.

I.

Remove the bracket on the passengers’ side
head holding the heater hoses.

J.

Remove the plastic engine cover that
extends over the engine.

K.

Remove the MAF from the factory air box,
then remove the air box.

L.

Remove the plate from underneath the origi-
nal air box location.

1.1

INITIAL PREPARATION AND REMOVAL

Advertising