Comtech EF Data CSAT-6070 User Manual

Page 32

Advertising
background image

50 Watt Model C-Band Transceiver

Revision 0

Installation

MN/CSAT607050.IOM

6. Attach bracket (5, figure 2-1) to the strap

(4) using two nuts (10), two flat washers,
(7), and two splitlock washers (8).


7. Place the assembly against the pole with

the strap around the pole and trim strap
(4) to fit as shown in Figure 2-5, using
the tin snips.


8. Attach bracket (3, figure 2-1) to the strap

(4) using two nuts (10), two flat washers
(7), and two splitlock washers (8).


9. Slide tensioner bracket (2) into channel

of the top unistrut bracket (1).


10. Place assembly on the pole. Slide

bracket (3) over bracket (2).


11. Place flat washer (7) and splitlock washer

(8), and nut (10) on bracket (2).


12. Tighten nut to secure the tension strap.


Figure 2-6. CSAT Single-Thread Bracket

with Hardware


13. Slide two springnuts, (4, figure 2-2) into channel of the Unistrut brackets

(1, figure 2-1).

14. Repeat procedure for second Unistruct bracket.


15. Install brackets (1, figure 2-2) and secure to unistruct bracket with bolts (6),

flat washers (2) and split lock washers (4).

IMPORTANT

Ensure the brackets are centered in each Unistruct. Ensure the
unit is positioned with the fan facing outward and free of any
obstructions. Do not tighten bolt (5) at this time.

16. Install four bolts (6, figure 2-2), flat washers (2) and splitlock washers (3) on

the CSAT unit.

2-8

Advertising