Comtech EF Data CSAT-6070 User Manual
Page 51
Advertising
50 Watt Model C-Band Transceiver
Revision 0
Installation
MN/CSAT607050.IOM
28. Install the assembled waveguide switch (Figure 2-19) and waveguide gaskets.
29. Secure assembly with bolts, lock washers and flat washers from hardware
kits supplied with each CSAT unit (not shown, PN AS/0402-2).
Figure 2-25. Installation of the
Waveguide Switch.
2-27
Advertising