Comtech EF Data CSAT-6070 User Manual

Page 51

Advertising
background image

50 Watt Model C-Band Transceiver

Revision 0

Installation

MN/CSAT607050.IOM

28. Install the assembled waveguide switch (Figure 2-19) and waveguide gaskets.

29. Secure assembly with bolts, lock washers and flat washers from hardware

kits supplied with each CSAT unit (not shown, PN AS/0402-2).








Figure 2-25. Installation of the

Waveguide Switch.







2-27

Advertising