Connection and wiring information, Pt-link-lon, Technical guide – Orion System PT-Link-LON User Manual

Page 4: Pt-link interface 4, Figure 2: pt-link-lon, Interface, Wiring

Advertising
background image

PT-Link-LON

®

Technical Guide

PT-Link Interface

4

Connection and Wiring Information

Figure 2: PT-Link-LON

®

Interface

Wiring

Modular Service Tool

Mode

Selection

ENTER

CLEAR

ESC

PREV

NEXT

DOWN

UP

6

5

4

DEC

7

0

8

1

3

2

9

MINUS

-

STATUS

SETPOINTS

SCHEDULES

CONFIGURATION

ALARMS

ON

OVERRIDES

BALANCE - TEST

Line Voltage

LON Connection
To LON Network

®

®

LON Connection
To LON Network

®

®

24 VAC
(10 VA)

Line Voltage

24 VAC
(8 VA)

Controller

SHLD

T

R

Typical Terminal Blocks. All
Wiring To Be T To T, SHLD
(G) To SHLD (G) & R To R

PT- Link-LON Interface

®

Note: All Programming Of
Controllers Must Be Done Using
The Modular Service Tool. The
Modular System Manager Should
Not Be Used On A System That
Has A PT-Link Installed.

Caution: The LON Network
Communication Terminal Block
Must Be Disconnected Before
Connecting The Modular Service
Tool. After Programming The
Controller, Disconnect
The Service Tool and Then
Reconnect The Communication
Terminal Block.

®

Wiring Notes:
1.) All wiring to be in accordance with local and national electrical codes
and specifications.

2.) All communication wiring to be 18 gauge minimum, 2 conductor twisted pair with
shield. Use Belden #82760 or equivalent.

Advertising