Pre-installation preparation, Continued, X4" vertical double stud – Desa CD36TN-M User Manual

Page 7

Advertising
background image

www.desatech.com

118531-01A



Figure 4 - Framing Clearances for

Installation Against an Exterior Wall

3"

3

1

/

4

"

Figure 5 - Framing Clearances for Corner

Installation

PRE-INSTALLATION PREPARATION

Continued

14

3

/

4

"

 - "x4" Vertical
Double Stud

14

3

/

4

"

21"

TO CENTER OF

TOP VENT

14

3

/

4

"

TO NAILING

FLANGES

56

3

/

4

"

12

1

/

4

"

TO

OPENING

28

5

/

8

"

These dimensions allow for 1" of
clearance at the sides and back of
fireplace. 0" clearance is also permitted
at all sides if framed.

Figure 6 - Unit Dimensions

7

5

/

8

"

TO CENTER OF

8" TOP VENT

14

3

/

4

"

TO NAILING

FLANGES

5/8"

36"

FACE DIM.

36

1

/

4

"

FACE DIM.

15

3

/

8

"

35

3

/

4

"

2 "

37"

TO NAILING

FLANGE

4

1

/

2

"

ELECTRICAL

INLET

8"

GAS SUPPLY

INLET

36

3

/

4

"

36

1

/

4

"

TO NAILING

FLANGE

2"

2"

38"

4"

TO

NAILING

FLANGE

WALL SWITCH

WIREWAY

WALL SWITCH

WIREWAY

2

1

/

2

"

Advertising