5 Installation Procedure
YASKAWA ELECTRIC
TOBP C730600 50C YASKAWA 1000-Series Option SI-T3 Installation Manual
21
6.
Insert the MECHATROLINK-II communications cables into the master’s option
modular female connector (CN3), then connect the option to a network. Ensure the
cable end is firmly connected.
Communication Cable Specifications
Only use cable recommended for MECHATROLINK-II. Using a cable not
specifically recommended may cause the option or unit to malfunction.
Connection Diagram
Figure 9
Figure 9 Wiring Diagram
Unit
CN5-A
FE
MECHATROLINK-II Master MECHATROLINK-II Cable
SI-T3
MECHATROLINK-II
Option
CN3
Advertising