5 Installation Procedure

YASKAWA ELECTRIC

TOBP C730600 50C YASKAWA 1000-Series Option SI-T3 Installation Manual

21

6.

Insert the MECHATROLINK-II communications cables into the master’s option
modular female connector (CN3), then connect the option to a network. Ensure the

cable end is firmly connected.

Communication Cable Specifications

Only use cable recommended for MECHATROLINK-II. Using a cable not

specifically recommended may cause the option or unit to malfunction.
Connection Diagram

Figure 9

Figure 9 Wiring Diagram

Unit

CN5-A

FE

MECHATROLINK-II Master MECHATROLINK-II Cable

SI-T3

MECHATROLINK-II

Option

CN3