PLANET FGSW-2620VM User Manual

Page 28

Advertising
background image

User’s Manual of FGSW-2620VM

FGSW-2612PVM LED indication

Figure 2-1-9:

FGSW-2612PVM LED panel

„

System

LED

Color

Function

PWR

Green

Lights

to indicate that the Switch has power.

„

Per 10/100Base-TX, PoE interfaces (Port-1 to Por-24)

LED

Color

Function

Lights

: To indicate the link through that port is successfully established.

LNK/ACT

Green

Blink: To indicate that the Switch is actively sending or receiving data over that port.

Lights

: To indicate the port is providing 48VDC in-line power.

PoE In-Use

Orange

Off:

To indicate the connected device is not a PoE Powered Device (PD).

„

Per 10/100/1000Base-T port /SFP interfaces

LED

Color

Function

LNK/ACT 1000

Green

Lit:

indicate that the port is operating at 1000Mbps.

Off

: indicate that the port is operating at 10Mbps or 100Mbps.

Blink

: indicate that the Switch is actively sending or receiving data over that port.

LNK/ACT 10/100

Green

Lit

: indicate that the port is operating at 10Mbps or 100Mbps.

Off

: indicate that the port is operating at 1000Mbps.

Blink

: indicate that the Switch is actively sending or receiving data over that port.

1. Press the RESET button

1-3 seconds

. The t Switch will reboot automatically.

2. Press the RESET button for about

10 seconds

. The Switch will back to the factory default mode; the

entire configuration will be erased.

3. The 2 Gigabit TP/SFP combo ports are shared with port 25/26 of FGSW-2620VM / FGSW-2620PVM /

FGSW-2620VMP4 / FGSW-2612PVM either of them can operate at the same time.

Advertising
This manual is related to the following products: