4 port sequential – PLANET WGSW-48040HP User Manual

Page 323

Advertising
background image

User’s Manual of WGSW-48040HP

4.16.4 Port Sequential

This page allows the user to configure the PoE Ports started up interval time

. The PoE Port will start up one by one as

Figure 4-16-3

shows.

Figure 4-16-3: PoE Port Sequential Power Up Interval Configuration Screenshot

The PoE port will start

providing power after the whole system program has finished running.

The page includes the following fields:

Object

Description

Sequential Power up
Option

Allows user to enable or disable Sequential Power up function

. The default is

enable.

Sequential Power up
Interval

Allows user to configure the PoE Port Start Up interval time.

Sequential Power up
Port Option

There are two modes for Starting Up the PoE Port

By Port: The PoE Port will start up by following Port number.
By Priority: The PoE Port will start up by following the PoE Priority.

Buttons

: Click to apply changes

: Click to undo any changes made locally and revert to previously saved values.

323

Advertising