Table 11. p300m/p300mq/p300mt current requirements, Initial startup procedure, multiple-unit systems, Master/slave operation – Fusion F300S User Manual

Page 57: Operating the system, Master/slave operation operating the system, Refer to

Advertising
background image

Installation, Operation, and Maintenance Manual # 509252 Rev R

57

3. Press the LAMP ON switch: the green LAMP ON indicator blinks, then stays lit.

4. Check the line currents. The line currents should conform to the values in

Table

11

.

5. Check RF detector and customer use interlocks as described in

Chapter 5,

“Troubleshooting.”

Initial Startup Procedure, Multiple-Unit Systems

1. Turn POWER switches of all units to ON.

2. Press the LAMP OFF/RESET switch of the Master.

3. Press the LAMP ON switch of all slaves.

4. Press LAMP ON switch of the Master.

NOTE: Front panel controls take precedence over remote or master commands.

Master/Slave Operation

One master power supply can control up to five slave units. Review

Chapter 2,

“Mechanical Installation”

to understand the interconnections and programming

needed.

Operating the System

1. Turn POWER switches of all units to ON.

2. Press the LAMP OFF/RESET switch of the Master.

3. Press the LAMP ON switch of all slaves.

Table 11. P300M/P300MQ/P300MT Current Requirements

System Line

Voltage

Single Phase

Line Currents (A)

with K300M

Modular Blower

without K300M

Modular Blower

200

15

14.5

208

14

13.5

220

14

13

230

13.5

13

240

13.5

12