Part 12. start-up procedure, Continued) – Munchkin Gas-Fired Hot Water Circulating Heater User Manual

Page 56

Advertising
background image

55

GAS-FIRED HEATER

Installation Manual

PART 12. START-UP PROCEDURE

(CONTINUED)

PART 13: START-UP PROCEDURES WITH THE VISION 1 OPTION

Function Value
d4 —

Not used

d5 —

Actual Temperature from the outdoor
sensor. (Vision option.)

d6 —

Actual Fan speed multiplied by 10
(Example: If fan speed displayed is
|410| RPM x 10 = 4100 actual fan
speed)

d7 —

Actual Ionization current read from
Flame Rectification probe

d8 —

Actual Status of the Central Heating
Circulator Off = |0|, On = |1|. (Vision
option.)

d9 —

Actual Status of the Indirect Fired
Circulator Off = |0|, On = |1|. (Vision
option.)

d10 —

Actual Status bus communication
|co| = connected, |no| = not connected

d11 —

Central Heating Set Point

d12 —

Power On Hours in units

d13 —

Total Central Heat Hours

d14 —

Total Indirect/dhw Hours

d15 —

Passed Ignition Attempts

D. TEST MODE

This function is intended to simplify the gas valve
adjustment if needed. Listed below are the

recommended limits on each Munchkin
Contender and the Combustion Settings.
Automatic modulation does not take place when
the controller is in Test mode, only temperature
limitation based on the Munchkin Contender
Central Heating set point. The user will be
allowed to increase or decrease the fan speed by
pressing in either the {S1/-or {S2/+} keys.

To activate the Test mode simply press the {S2/+}
and {S3/Program} key together for 1 second. Once
activated, you will see in the display {Ser} and the
actual fan speed. The measurement of the com-
bustion levels should always be taken at the high-
est and lowest fan speed. After 10 minutes, the
Test mode stops automatically. To exit Test Mode
press {S1/-} and {S2/+} key together for 1 second.

CCOOM

MBBUUSSTTIIOONN SSEETTTTIINNGGSS

HHIIGGHH FFIIRRIINNGG RRAATTEESS aanndd LLOOW

W FFIIRRIINNGG RRAATTEESS OONN AALLLL M

MOODDEELLSS

NNaattuurraall GGaass

PPrrooppaannee LLPP

low

high

low

high

CCaarrbboonn

M

Moonnooxxiiddee

((CCOO %

%))

0–20 ppm

70 ppm–135 ppm

0–20 ppm

80 ppm–150 ppm

CCaarrbboonn

DDiiooxxiiddee

((CCOO22 %%))

8½% – 9½%

8½% – 9½%

9½% – 10½%

9½% – 10½%

The Vision I option allows the user to have one
temperature for central heating and another
temperature for the Super Stor Ultra Indirect
Fired Water Heater. This allows the user to
increase the temperature supplied to the Super
Stor Ultra indirect water heater to get a fast
recovery by prioritizing the flow at a higher tem-
perature than may be needed for the Central
Heating Circuits (this will require two separate
circulators). Once the Super Stor Ultra Indirect is
satisfied, the Vision I system will switch back to
the Central Heating Circuit to continue to heat
the living space at a temperature based on out-
side temperature. This gives you a higher com-
fort level and further increases the efficiency of
the Munchkin Contender.

A. PROGRAMMING THE VISION I OPTION

The Vision I option allows the installer to set sys-
tem limits and the heat curve for the Munchkin
Contender. These system limits should not be
changed by the user. It is important to document
your settings within this manual after you pro-
gram the sytem parameters so this will be
recorded for future reference.

B. VISION 1 PROGRAM ACCESS

To start, press down and hold the {S/3} and {S/4}
simultaneously for three seconds. You will notice
that the display will change to |000|. Then, with
your {S1/-} key on the display press down until you
see |925|. This is the pass code. To confirm that

Fig. 12-1

Advertising