Hea ter st art up report – Munchkin Gas-Fired Hot Water Circulating Heater User Manual

Page 67

Advertising
background image

66

GAS-FIRED HEATER

Installation Manual

Light Off Activities

1) Fill the heating system

Check all piping and gas connections, verify they are all tight

Pressurize System (12-15 PSI)

_____PSI

Add Water to prime condensate cup

What percentage of propylene glycol is installed in the system (0-50%)

____%

Verify near heater piping is properly supported

2) Check Gas Pipe

Leak test using locally approved methods (consult jurisdictional code book)

Check incoming gas pressure (3.5" to 14" W.C.)

____in w.c.

Static

What is the "drop" on light off (No more than 1" W.C.)

____in w.c.

Dynamic

3) Check Combustion

Check and adjust (if necessary) carbon dioxide content

____% CO2

High Fire

____%CO2

Low Fire

Check and adjust (if necessary) carbon monoxide content

____ppm CO

High Fire

____ppm CO

Low Fire

4) Verify System Operation

Turn up thermostat to verify wiring connections

5) Record Ionization Current

Check

µA reading at d7 on the status menu (see start-up section)

____

µA

H

igh Fire

____

µA

Low Fire

6) Record System Settings

Record heating curve (with optional Vision One kit, record steps)

____*8

____*9

____*10

____*11

7) Indirect water heater

Verify safety and operation of the Super-Stor Indirect water heater, record setttings

____de

____dh

8) Convert the heater

If necessary convert the heater to the proper type of gas (always use proper kit)

Locate the stickers in the appropriate locations on the heater

Verify Combustion settings after gas conversion, Carbon Dioxide

____% CO2

High Fire

____% CO2

Low Fire

Verify Combustion settings after gas conversion, Carbon Monoxide

____ppm CO

High Fire

____ppm CO

Low Fire

Mail in the conversion registration

Notes:

Date completed _______________

HEA

TER ST

ART UP REPORT

Advertising