2 installation, 1 unpacking, 2 installation -6 – MITSUBISHI ELECTRIC Mitsubishi Industrial Robot RV-6S User Manual

Page 16: 1 unpacking -6, Caution

Advertising
background image

2-6

Installation

2Unpacking to Installation

2.2 Installation

2.2.1 Unpacking

Fig.2-1 : Unpacking the robot arm

The robot is shipped from the factory in cardboard and wooden frame packing. Always refer to

Fig. 2-1

and unpack

the robot. Handle the robot arm according to

"2.2.2 Transportation procedures (Transporting with a crane)"

.

The unpacking process is shown below.

1) Using a knife, etc., slit the tape <1> fixing the upper lid <2> of the cardboard box. (

Fig. 2-1 (a)

)

2) Pull the upper lid <2> of the cardboard box off with both hands. (

Fig. 2-1 (b)

)

3) Remove the hexagon socket bolts <3> (four positions) connecting the sleeper and the base unit. (

Fig. 2-1

(c))

4) This completes the unpacking. (

Fig. 2-1 (c)

)

<2> Upper lid

(a)

(b)

(c)

Pull off

Robot arm

<1> Tape

!

CAUTION

!

Always unpack the

robot at a flat place.

The robot could tilt
over if unpacked at an

unstable place.

Advertising