MITSUBISHI ELECTRIC Mitsubishi Industrial Robot RV-6S User Manual

Page 9

Advertising
background image

CONTENTS

i

Page

1 Before starting use ......................................................................................................................................................................... 1-1

1.1 Using the instruction manuals ............................................................................................................................................ 1-1

1.1.1 The details of each instruction manuals ................................................................................................................ 1-1
1.1.2 Symbols used in instruction manual ........................................................................................................................ 1-2

1.2 Safety Precautions ................................................................................................................................................................. 1-3

1.2.1 Precautions given in the separate Safety Manual ............................................................................................. 1-4

2 Unpacking to Installation .............................................................................................................................................................. 2-5

2.1 Confirming the product ......................................................................................................................................................... 2-5
2.2 Installation .................................................................................................................................................................................. 2-6

2.2.1 Unpacking ............................................................................................................................................................................ 2-6
2.2.2 Transportation procedures (Transporting with a crane) ................................................................................. 2-7
2.2.3 Installation procedures .................................................................................................................................................. 2-8
2.2.4 Grounding procedures .................................................................................................................................................... 2-9

(1) Grounding methods ..................................................................................................................................................... 2-9
(2) Grounding procedures ............................................................................................................................................... 2-9

2.2.5 Connecting with the controller ................................................................................................................................ 2-10

2.3 Setting the origin ................................................................................................................................................................... 2-12

2.3.1 Installing the teaching pendant (T/B) ................................................................................................................... 2-12

(1) Installing with the control power OFF .............................................................................................................. 2-12

2.3.2 Setting the origin with the origin data input method ...................................................................................... 2-13

(1) Confirming the origin data ..................................................................................................................................... 2-13
(2) Turning ON the control power ............................................................................................................................. 2-13
(3) Preparing the T/B ..................................................................................................................................................... 2-14
(4) Selecting the origin setting method ................................................................................................................... 2-15
(5) Inputting the origin data ......................................................................................................................................... 2-16
(6) Installing the shoulder coverB ............................................................................................................................. 2-17

2.4 Confirming the operation .................................................................................................................................................... 2-18

(1) JOINT jog operation ................................................................................................................................................. 2-21
(2) XYZ jog operation ...................................................................................................................................................... 2-23
(3) TOOL jog operation .................................................................................................................................................. 2-25
(4) 3-axis XYZ jog operation ....................................................................................................................................... 2-27
(5) CYLNDER jog operation ......................................................................................................................................... 2-29

3 Installing the option devices ..................................................................................................................................................... 3-31

3.1 Installing the solenoid valve set (1S-VD01-02/VD02-02/VD03-02/VD04-02) ........................................ 3-31
3.2 Installing the hand input cable ......................................................................................................................................... 3-34
3.3 Installing the hand output cable ...................................................................................................................................... 3-35
3.4 .Changing the operating range ......................................................................................................................................... 3-36

4 Basic operations ............................................................................................................................................................................ 4-38

5 Maintenance and Inspection ..................................................................................................................................................... 5-39

5.1 Maintenance and inspection interval ............................................................................................................................. 5-39
5.2 Inspection items ..................................................................................................................................................................... 5-40

5.2.1 Daily inspection items .................................................................................................................................................. 5-40
5.2.2 Periodic inspection ........................................................................................................................................................ 5-41

5.3 Maintenance and inspection procedures ..................................................................................................................... 5-42

5.3.1 Robot arm structure ..................................................................................................................................................... 5-42
5.3.2 Installing/removing the cover ................................................................................................................................... 5-44
5.3.3 Inspection, maintenance and replacement of timing belt .............................................................................. 5-46

(1) Timing belt replacement period ......................................................................................................................... 5-46
(2) Inspection, maintenance and replacement of J5-axis timing belt ........................................................ 5-47
(3) Timing belt tension ................................................................................................................................................... 5-48

5.3.4 Lubrication ........................................................................................................................................................................ 5-49

(1) Lubrication position and specifications ............................................................................................................ 5-49

Advertising