3 installing the hand output cable, 3 installing the hand output cable -35 – MITSUBISHI ELECTRIC Mitsubishi Industrial Robot RV-6S User Manual

Page 45

Advertising
background image

3Installing the option devices

Installing the hand output cable 3-35

3.3 Installing the hand output cable

The procedure for installing the hand output cable is as follows. Conduct work by referring to

"Fig. 3-1Solenoid

valve installation procedures" on page 31

and

"Fig. 3-5Installing the hand output cable" on page 35

below.

This work must be carried out with the controller power turned OFF.

Fig.3-5 : Installing the hand output cable

1) Remove the hexagon socket bolts (five M4 x 10) and truss screw (three M3 x 8) that hold the No. 2 arm cover

B <2>, and then remove both the No. 2 arm cover B <2>.

2) Remove the socket bolts <4> (four M4 x 8) that hold the No. 2 arm cover C <3> or the solenoid valves <5>,

and then remove the No. 2 arm cover C <3> or the solenoid valves <5>.

3) If you are not using the spare line (ADD: stored in a coil) in section A shown in

Fig. 3-1

, remove it. The spare

line is connected to a connector inside section A.

4) The hand output cable can be installed to both the No. 2 arm cover C <3> and the solenoid valves <5>.

However, if solenoid valves of three rows or more are used, it is not possible to install a hand output cable
separately because the hand output connectors (2 pcs.) in the forearm and the solenoid valves are already
connected.

5) Remove one of the two grommets on either the No. 2 arm cover C <3> or the solenoid valves <5>. After

removing the grommet, peal off the sealing material left on the hole section of the plate.

6) After removing the lock nut attached to the hand output cable, feed the connector side of the hand output

cable (with a cable clamp) through the hole on the plate. Replace the removed lock nut in position and fasten
it securely.

7) Connect the connectors of "GR1" and "GR2" stored in section A shown in

Fig. 3-1

to "GR1" and "GR2" of

the hand output cable.

8) Mount the No. 2 arm cover C <3> or the solenoid valves <5> to section A shown in

Fig. 3-1

. When mounting,

be careful not to damage the sponge sealing material attached to the opening of section A.

9) When you have completed the installation, reinstall the No.2 arm cover B <2> to its original position, and be

careful not to entangle the cables when you do so.

D

D

GR1

GR2

Grommet

Remove

Grommet

Remove

(M4×8, 4 bolts)

<4> Socket bolts

Plate

<5> Solenoid valves

<3> No. 2 arm cover C

Cable clamp

Lock nut

View D

Plate

Advertising