3 installing the option devices, 3 installing the option devices -31 – MITSUBISHI ELECTRIC Mitsubishi Industrial Robot RV-6S User Manual

Page 41

Advertising
background image

3Installing the option devices

Installing the solenoid valve set (1S-VD01-02/VD02-02/VD03-02/VD04-02) 3-31

3 Installing the option devices
3.1 Installing the solenoid valve set (1S-VD01-02/VD02-02/VD03-02/VD04-02)

Fig.3-1 : Solenoid valve installation procedures

View B

View C

A port

B port

GR8

GR6

GR4

GR2

GR7

GR5

GR3

GR1

No.1 solenoid valve

<7>R port

<6>P port

Plate

No.2 solenoid valve

No.3 solenoid valve

No.4 solenoid valve

Section A

<5>Solenoid valve

<1>No.2 arm cover A

Remove

<4>Socket bolt

(M4×8, 4 bolts)

<2>No.2 arm cover B

<3>No.2 arm cover C

Socket bolt (M4×8, 4 bolts)

(Attached to the solenoid valve)

Advertising