Troubleshooting & repair, Procedure – Lincoln Electric IDEALARC CV-305 User Manual

Page 74

Advertising
background image

OUTPUT RECTIFIER BRIDGE REMOVAL & REPLACEMENT

(CONTINUED)

TROUBLESHOOTING & REPAIR

F-42

F-42

IDEALARC® CV-305

PROCEDURE

1.

Disconnect main AC input power to the machine.

2.

Remove the Case Roof and Case Sides.

3.

Test that the capacitors are discharged using a

D.C. voltmeter.

a.

Polarity must be observed.

4.

Remove the Capacitor Bank Assembly. See the
Capacitor Bank Replacement Procedure.

5.

Disconnect the three transformer secondary leads

connected to the three SCR heat sinks using a 1/2"

open wrench.

a.

Disconnect leads #221, #222, and #223.

b.

Note placement of leads and hardware for re-

assembly.

6.

Remove plug J1 from the control board.

7.

Cut any cable ties that would restrict the removal of

the assembly.

8.

Disconnect the three #204 leads connected to the

bottom of the positive SCR heat sink using a 7/16"

open end wrench.

9.

Remove the four mounting screws that fasten the

Rectifier Assembly to the lift bail assembly.

a.

Note the placement and arrangement of the

insulating materials on the mounting screws

for re-assembly. See Figure F.15.

10. Remove the rectifier bridge assembly carefully

from the machine.

a.

Clear or cut any cable ties or leads that may

hamper the removal of the assembly.

NOTE: If further disassembly is required, see

SCR

Removal and Replacement Procedure and

Diode Mounting Instruction.

Insulators

Heat Sink

Mounting

Bracket

FIGURE F.15 - RECTIFIER INSULATION

Re

tu

rn

to

Se

ct

io

n

T

O

C

Re

tu

rn

to

Se

ct

io

n

T

O

C

Re

tu

rn

to

Se

ct

io

n

T

O

C

Re

tu

rn

to

Se

ct

io

n

T

O

C

Re

tu

rn

to

M

a

st

e

r

T

O

C

Re

tu

rn

to

M

a

st

e

r

T

O

C

Re

tu

rn

to

M

a

st

e

r

T

O

C

Re

tu

rn

to

M

a

st

e

r

T

O

C

Advertising