Troubleshooting & repair, Scr removal and replacement procedure (continued) – Lincoln Electric IDEALARC CV-305 User Manual

Page 81

Advertising
background image

SCR REMOVAL AND REPLACEMENT PROCEDURE

(CONTINUED)

TROUBLESHOOTING & REPAIR

F-49

F-49

IDEALARC® CV-305

PROCEDURE FOR THE 5/8 INCH WIDE

SPRING

1.

Place a piece of sleeving around each bolt.

2.

Insert bolts thru the leaf spring. The leaf spring is

flat so the orientation of the leaf spring does not

matter.

3.

Place the steel pressure pad in the housing with

the 1/8 inch wide standoff facing up. See Figure

F.19.

Figure F.19 - Housing and Pressure Pad for 5/8"

Wide leaf spring.

4.

Insert bolts and leaf spring into plastic housing

being sure that the steel pressure pad remains in

position. Pressing on the bolt heads should pro-

duce a rocking action of the spring in it's housing.

5.

Insert clamp assembly thru heat sinks. Install nuts.

Tighten clamp nuts equally on bolts until finger

tight. Be sure that the leaf spring is not cocked in

the housing. See Figure F.20. Heat sinks may not

be exactly as pictured.

6.

Re-inspect the SCR for proper seating.

Figure F.20 - Clamp Assembly.

STEEL PRESSURE PAD

5/8"

HOUSING

HOUSING

HEAT SINK

1/4-28 OR 1/4-20

CAP SCREW

SLEEVING

S.C.R.

HEAT SINK

PLAIN WASHER

HEX NUT

LEAF

SPRING

STEEL

PRESSURE

PAD

Re

tu

rn

to

Se

ct

io

n

T

O

C

Re

tu

rn

to

Se

ct

io

n

T

O

C

Re

tu

rn

to

Se

ct

io

n

T

O

C

Re

tu

rn

to

Se

ct

io

n

T

O

C

Re

tu

rn

to

M

a

st

e

r

T

O

C

Re

tu

rn

to

M

a

st

e

r

T

O

C

Re

tu

rn

to

M

a

st

e

r

T

O

C

Re

tu

rn

to

M

a

st

e

r

T

O

C

Advertising