Troubleshooting & repair, Scr removal and replacement procedure (continued) – Lincoln Electric IDEALARC CV-305 User Manual

Page 80

Advertising
background image

SCR REMOVAL AND REPLACEMENT PROCEDURE

(CONTINUED)

TROUBLESHOOTING & REPAIR

F-48

F-48

IDEALARC® CV-305

CLAMPING

PROCEDURE

FOR

1/4-28

BOLTS.

Note: This procedure can only be used with 1/4-28

bolts.

Do not use bolts with any other type thread or new SCR

will be damaged.

Do not over tighten cap screws. The leaf spring will

apply the required clamping force to the SCR.

1.

Do not turn the nuts. While holding the nuts sta-

tionary, turn the cap screws only with the following

procedure.

2.

Tighten first cap screw 1/4 turn.

3.

Tighten second cap screw 1/2 turn.

4.

Tighten first cap screw 1/2 turn.

5.

Tighten second cap screw 1/2 turn.

6.

Tighten first cap screw 1/4 turn.

7.

Assembly now has proper clamping force.

8.

Perform the

Active SCR Test.

CLAMPING

PROCEDURE

FOR

1/4-20

BOLTS.

Note: This procedure can only be used with 1/4-20

bolts.

Do not use bolts with any other type thread or new

SCR will be damaged.

Do not over tighten cap screws. The leaf spring will

apply the required clamping force to the SCR.

1.

Do not turn the nuts. While holding the nuts sta-

tionary, turn the cap screws only with the following

procedure.

2.

Tighten first cap screw 1/4 turn.

3.

Tighten second cap screw 1/2 turn.

4.

Tighten first cap screw 1/2 turn.

5.

Tighten second cap screw 1/4 turn.

STOP.

6.

Assembly now has the proper clamping force.

7.

Perform the

Active SCR Test.

Re

tu

rn

to

Se

ct

io

n

T

O

C

Re

tu

rn

to

Se

ct

io

n

T

O

C

Re

tu

rn

to

Se

ct

io

n

T

O

C

Re

tu

rn

to

Se

ct

io

n

T

O

C

Re

tu

rn

to

M

a

st

e

r

T

O

C

Re

tu

rn

to

M

a

st

e

r

T

O

C

Re

tu

rn

to

M

a

st

e

r

T

O

C

Re

tu

rn

to

M

a

st

e

r

T

O

C

Advertising