7.0 Site Requirements

© Baxi Heating UK Ltd 2008

7.1

Location

1. The boiler may be fitted to any suitable wall with the flue

passing through an outside wall or roof and discharging to

atmosphere in a position permitting satisfactory removal of

combustion products and providing an adequate air supply.

The boiler should be fitted within the building unless

otherwise protected by a suitable enclosure i.e. garage or

outhouse. (The boiler may be fitted inside a cupboard-see

Section 7.3).

2. If the boiler is sited in an unheated enclosure then it is

recommended to leave the ON/OFF Selector Switch in the

domestic hot water and central heating position to give frost

protection.

3. If the boiler is fitted in a room containing a bath or shower

reference must be made to the relevant requirements.

In GB this is the current I.E.E. Wiring Regulations and Building

Regulations.

In IE reference should be made to the current edition of I.S.

813 “Domestic Gas Installations” and the current ETCI rules.

4. If the boiler is to be fitted into a building of timber frame

construction then reference must be made to the current

edition of Institute of Gas Engineers Publication IGE/UP/7

(Gas Installations in Timber Framed Housing).

7.2

Clearances (Figs. 8 & 9)

1. A flat vertical area is required for the installation of the

boiler.

2. These dimensions include the necessary clearances around

the boiler for case removal, spanner access and air

movement. Additional clearances may be required for the

passage of pipes around local obstructions such as joists

running parallel to the front face of the boiler.

200mm Min

780mm

450mm

200mm Min

(300mm Min if

using 80/125mm

flueing system)

5mm Min

5mm Min

450mm Min

For Servicing

Purposes

Fig. 8

Fig. 9

In Operation

5mm Min

At least 1.5°