0 installation – Baxi Potterton Gold HE A Range User Manual

Page 28

Advertising
background image

28

© Baxi Heating UK Ltd 2008

10.0 Installation

10.1

Unpacking & Initial Preparation

The gas supply, gas type and pressure must be checked for

suitability before connection (see Section 7.4).

NOTE: a small amount of water may drain from the

boiler in the upright position.

1. Remove staples, open flaps and remove the cardboard

sheet. Remove the polystyrene side pieces and literature.

Two people can then lift out the boiler (Figs. 39 & 40).

2. After considering the site requirements

(see Section 7.0) position the fixing template on the wall

ensuring it is level both horizontally and vertically.

3. Mark the position of the two most suitable fixing slots for
the wall plate and boiler lower fixing holes. It is preferable to
use the vertical fixing slots.

4. Mark the position of the centre of the flue hole (rear
exit). For side flue exit, mark as shown (Fig. 41).

5. If required, mark the position of the gas and water pipes.

Remove the template.

6. Cut the hole for the flue (minimum diameter 116mm).

7. Drill the wall as previously marked to accept the wall
plugs supplied. Secure the wall plate using the fixing screws.

8. Using a spirit level ensure that the plate is level before
finally tightening the screws.

9. Connect the gas and water pipes to the valves on the
wall plate using the copper tails supplied. Ensure that the
sealing washers are fitted between the connections.

10. Fit the filling loop as described in the instructions

supplied with it.

10.2

Flushing

1. Connect a tube to the central heating flow or return pipe

(Fig. 42 & 43).

2. Flush thoroughly (see System Details, Section 6.2).

Fig. 43

145mm

For Side Flue Exit

Central Heating Return

Flushing Tube

Wall Plate

Fig. 41

Fig. 39

Fig. 40

Fig. 42

Advertising