11.0 Commissioning

© Baxi Heating UK Ltd 2008

11.1

Commissioning the Boiler

1. Reference should be made to BS 5449 Section 5 when

commissioning the boiler.

2. Open the mains water supply to the boiler.

IMPORTANT: The heat exchanger air vent on top of the

boiler (Fig. 62) MUST be opened before filling the

primary system.

3. Open all hot water taps to purge the DHW system.

4. Ensure that the filling loop is connected and open, then

open the heating flow and return valves on the boiler.

5. Open the screw on the automatic air vent on the pump

body (Fig. 63).

6. The system must be flushed in accordance with BS 7593

(see Section 6.2) and the flushing agent manufacturers

instructions.

7. Pressurise the system to 1.5 bar (Fig. 64) then close and

disconnect the filling loop.

8. Turn the gas supply on and purge according to in GB BS

6891 and in IE I.S. 813 “Domestic Gas Installations”.

9. Test for gas soundness.

10. Hinge the facia panel upwards and refit the case front

panel. Tighten the securing screws.

11. Turning either of the temperature control knobs will set

the relevant temperature. When the knob is turned the

display will alter and show the selected temperature. After a

few seconds the display reverts to show the current boiler

temperature (Fig. 65).

Pump

Automatic Air

Vent

Pressure Gauge

Screw

bar

0

1

2

3

4

Fig. 63

Selector Switch

Central Heating

Temperature Control

Domestic Hot Water
Temperature Control

Reset

1

2

3

4

5

PM

7

8

9

10

11

12

1

2

3

4

5

AM

7

8

9

10

11

12

0

bar

0

1

2

3

4

Pump

Fig. 65

Fig. 64

Display

Heat Exchanger

Automatic Air Vent

Fig. 62

Advertising