0 completion – Baxi Potterton Gold HE A Range User Manual

Page 37

Advertising
background image

37

12.0 Completion

© Baxi Heating UK Ltd 2008

12.1

Completion

1. Instruct the user in the operation of the boiler and

system explaining the operational sequence.

2. Set the central heating and hot water temperature

control knobs to the requirements of the user.

3. Carefully read and complete all sections of the

Benchmark Commissioning Checklist at the rear of this

publication that are relevant to the appliance and

installation. These details will be required in the event of

any warranty work. The publication must be handed to the

user for safe keeping and each subsequent regular service

visit recorded.

4. For IE, it is necessary to complete a “Declaration of

Conformity” to indicate compliance with I.S. 813. An

example of this is given in I.S. 813 “Domestic Gas

Installations”. This is in addition to the Benchmark

Commissioning Checklist.

5. Hand over the Users Operating, Installation and

Servicing Instructions giving advice on the necessity of

regular servicing.

Fig. 72

Facia Panel

Case Front Panel

Advertising