Regulatory approvals inverter overload operation – Xantrex Technology ENERGY HW 1000 User Manual

Page 69

Advertising
background image

Regulatory Approvals

975-0467-01-01

A–5

Regulatory Approvals

Inverter Overload Operation

This graph shows how long (measured in seconds) the

Freedom HW

will

operate for a given output current (measured in Amps).

The graph illustrates inverter operation at 25 °C.

ETL approved to CSA 107.1, UL458

10

12

14

16

18

20

30

40

50

Time (sec)

1600

1400

1200

1000

800

600

400

200

0

Output Current (Amps)

4000
.
.
.

Advertising