GE Industrial Solutions TLE Series 225-500 User Manual User Manual

Page 29

Advertising
background image

Critical Power

Modifications reserved

Page 29/90

GE_UPS_USM_TLE_SUL_M22_M50_1US_V010.docx

User Manual TLE Series 225 - 500 UL S1

LOAD SCREEN

Voltage L1 / L2 / L3
Output voltage PHASE/NEUTRAL for
each phase.

Current L1 / L2 / L3
The output current as RMS values for
each phase.

Percent load L1 / L2 / L3
The output Load as percentage for each
phase.

Active power

Load active power (kW) for each phase.

Apparent power

Load apparent power (kVA) for each phase.

Power factor

Load power factor: + inductive load / - capacitive load

Status

Source of the power supplied to the Load.

Inverter operating time

Total operating time for the Inverter (in hours).

Apparent power

Total apparent Load power (kVA).

UPS operation time

Total operating time for the UPS (in hours).

Active Power

Total effective Load power (kW).

eBoost operation time

Total operating time for the UPS in eBoost™ Operation Mode (in hours).
This counter is displayed only when eBoost™ Operation Mode is available
(option).

Overload counter

Total number of detected output overloads.

IEMi operation time

Total operating time for the UPS in IEMi Operation Mode (in hours).
This counter is displayed only when IEMi Operation Mode is available (option).


BOOSTER SCREEN

Battery voltage
The battery voltage.

Battery current
The battery current (negative values
correspond to the discharge of the
battery).

Voltage DC-link 1
DC-link 1 voltage.


Voltage DC-link 2

DC-link 2 voltage.

Status

Booster status (Off / Booster / Charger).

Temperature

Temperature of the 4

th

leg’s bridge.

Temperature 1

Booster temperature.

Advertising