User Manual TLE Series 225 - 500 UL S1

WARNING !

Verify that the input/output connections have been performed by qualified
personnel before connecting Utility input voltage and verify that the
equipment is correctly grounded.

Open only the front door, do not remove any panels.

Now you can initiate the start-up procedure of the UPS system.
There is no need for specific knowledge if you follow carefully the step-by-
step instructions given below.
However we recommend that at least the initial procedure should be
performed by an instructed person.

Check after every step for correct reaction of the UPS (LEDs on the panel),
and correct voltage and current measurements, before you proceed to the
next step.

If you encounter any problems during the following procedures, you
should not continue, but contact GE Global Services
.





NOTE !

All operations (including start-up, shut-down, removing/adding a unit
from/to a Parallel System
) MUST BE PERFORMED with eBoost™ Operation
Mode
DISABLED.





Find on the following pages the descriptions of the various procedures of start-up and
shut-down for single and parallel UPSs
, divided into the following principal chapters:

8.1

PROCEDURES FOR SINGLE TLE Series 225 - 500

8.2

PROCEDURES FOR SINGLE TLE Series 225 - 500 FUNCTIONING AS FREQUENCY
CONVERTER

8.3

PROCEDURES FOR TLE Series 225 - 500 PARALLEL SYSTEM




This symbol refers to the operations of a RPA Parallel System.