GE Industrial Solutions TLE Series 225-500 User Manual User Manual

Page 65

Advertising
background image

Critical Power

Modifications reserved

Page 65/90

GE_UPS_USM_TLE_SUL_M22_M50_1US_V010.docx

User Manual TLE Series 225 - 500 UL S1

2. Close UPS output switch Q1 (Pos. I).

Rectifier starts automatically.
LED 1 (Rectifier) blinking, indicates Soft-start.

At the end of Rectifier Soft-start the LED 1 (Rectifier) remains lit.

3. Connect the Battery to the UPS by closing the external Battery protections and close, if

present, the switch CB3 (option).
Attention: check the right DC polarities on both side of the switch/fuse holder!

NOTE !

Ensure the LED 1 (Rectifier) is lit before carrying out this procedure.
It indicates that the DC-Link has reached 800Vdc (see screen MEASURES / Rectifier)
!

4. Insert the inverter performing the command Inverter ON".

Before performing this procedure make sure that the LED 1 (Rectifier) and LED 3 (Booster/Battery
charger)
are lit.

Perform the “Inverter ON” command from the screen:

Commands 1 / Inverter / ON.

Soft-start of Inverter indicated with blinking LED 2 (Inverter).

At the end of Soft-start the LED 2 (Inverter) remains lit.

Load is now supplied from Inverter.

LED ALARM turns Off and the LED LOAD PROTECTED must be lit.

The Synoptic Diagram must display the statusLOAD
SUPPLIED BY INVERTER
.

END OF PROCEDURE



NOTE !

The Battery must be charged for at least 10 hours, in order to ensure the full backup
runtime in case of a Utility Failure
.

Advertising