GE Industrial Solutions TLE Series 225-500 User Manual User Manual

Page 56

Advertising
background image

Critical Power

Modifications reserved

Page 56/90

GE_UPS_USM_TLE_SUL_M22_M50_1US_V010.docx

User Manual TLE Series 225 - 500 UL S1

7.1.2 UPS shut-down with load transfer on Manual Bypass Q2

NOTE !

If eBoost™ option is available, make sure that eBoost™ Operation Mode is disabled
before starting this procedure.



Initial status:
Load supplied from Inverter.




1. Disconnect the Inverter performing the “Inverter OFF” command.

1 - Perform the “Inverter OFF” command from the

screen: Commands 1 / Inverter / OFF.

Load is transferred to Utility by Automatic Bypass.

2 - Repeat the “Inverter OFF” command from the

screen: Commands 1 / Inverter / OFF.

Inverter shuts down. LED 2 (Inverter) must be OFF.

LED ALARM is lit.

The Synoptic Diagram must display the statusLOAD
SUPPLIED BY AUTOMATIC BYPASS
.

2. Close Manual Bypass switch Q2 (Pos. I).

Load is now supplied parallel through Automatic Bypass and Manual Bypass Q2.

The Synoptic Diagram must display the statusLOAD
SUPPLIED BY AUTOMATIC BYPASS AND MANUAL BYPASS
Q2
.



Continue

Advertising