Control signal inputs, Blj3 power connections, Table 2-k: blj3 control signal inputs – GE Industrial Solutions Galaxy Vector Controller GCM3 User Manual

Page 27: Table 2-l: power connections blj3

Advertising
background image

Galaxy Vector Controller GCM2, GCM3

Issue 4 January 2008

Product Description 2 - 13

Control Signal Inputs

Table 2-K: BLJ3 Control Signal Inputs

Control Signal

Name

Description

Indoor Input Connection

RO

Reserve Operation

closure to BAT

PBT

Power Battery Test

closure to BAT

BLJ3 Power
Connections

Power connections from the system to the BLJ3 (factory wired).

Table 2-L: Power Connections BLJ3

Description

Input

Termination

Associated

Fuse

Plant Termination

(+) PWR Controller

BAT

F2

Charge Bus (Rectifier bus)

(-) PWR Controller

DG

Discharge Return Bus

LVD power #1

See note 1

NA

Charge Bus (Rectifier bus)

LVD power #2

See note 1

NA

Battery Bus

Aux. Bat. Source

ABS

See note 2

F1

NA

Note 1: LVD control power, from the power buses for the indoor system, is connected to the
BJNx LVD controller board
Note 2: BLJ3 user available fused (F1) power terminations are labeled ABS. DG terminations are
also provided for user termination on the BLJ3. These terminations are labeled DG.

Advertising