Control signal inputs, Blj3 power connections, Table 2-k: blj3 control signal inputs – GE Industrial Solutions Galaxy Vector Controller GCM3 User Manual
Page 27: Table 2-l: power connections blj3
Galaxy Vector Controller GCM2, GCM3
Issue 4 January 2008
Product Description 2 - 13
Control Signal Inputs
Table 2-K: BLJ3 Control Signal Inputs
Control Signal
Name
Description
Indoor Input Connection
RO
Reserve Operation
closure to BAT
PBT
Power Battery Test
closure to BAT
BLJ3 Power
Connections
Power connections from the system to the BLJ3 (factory wired).
Table 2-L: Power Connections BLJ3
Description
Input
Termination
Associated
Fuse
Plant Termination
(+) PWR Controller
BAT
F2
Charge Bus (Rectifier bus)
(-) PWR Controller
DG
Discharge Return Bus
LVD power #1
See note 1
NA
Charge Bus (Rectifier bus)
LVD power #2
See note 1
NA
Battery Bus
Aux. Bat. Source
ABS
See note 2
F1
NA
Note 1: LVD control power, from the power buses for the indoor system, is connected to the
BJNx LVD controller board
Note 2: BLJ3 user available fused (F1) power terminations are labeled ABS. DG terminations are
also provided for user termination on the BLJ3. These terminations are labeled DG.