Post installation procedures, A - 13 – GE Industrial Solutions Galaxy Vector Controller GCM3 User Manual

Page 91

Advertising
background image

Galaxy Vector Controller GCM2, GCM3

Issue 4 January 2008

Communications Appendix A - 13

then the configuration procedure must be repeated.

Post Installation

Procedures

Once configuration has been completed

1. Disconnect the serial cable from the Galaxy Gateway (J2

connector).

2. Connect the 9-pin male end of the auxiliary port cable

assembly to the J2 connector on the Galaxy Gateway.

3. Press SW1 (uP reset) on the Galaxy Gateway.

4. After approximately one minute, observe the LEDs on the

Galaxy Gateway.

• Yellow STATUS LED: OFF
• Green STATUS LED: ON
• Link LED: ON
• XMIT/RCV: May be blinking

The Galaxy Gateway should be communicating over the
network.

5. Secure the cable to the lance on the mounting bracket using

the cable tie provided.

Advertising