Preparation, Precautions, A - 5 – GE Industrial Solutions Galaxy Vector Controller GCM3 User Manual

Page 83

Advertising
background image

Figure A-2b: GPS with Plastic Door (DA) and Vector Controller

407882141
Standoff
(2 Places)

901377366
Pan Head Screw
(M3 x 6mm)
(3 Places)

848649943
Bracket

BIC or GCM

BLJ3

845143866
Screw e/w Lockwasher
6-32 x 5/16" (2 Places)
Torque 10 in·lbs

408456465 Support Post
(2 Places)
Torque 3 in·lbs

848589859
Lexan Cover

Fold top of lexan cover over board
and secure with pan head screws.

108340100
EBW1
Gateway PWB

Galaxy Vector Controller GCM2, GCM3

Issue 4 January 2008

Communications Appendix A - 5

Preparation

The following Network Configuration Parameters must be
obtained from your Network Administrator before starting:

IP address

Subnet mask

Host name

Gateway IP address

Note: Host and Gateway are optional.

Precautions

Note: Before starting, make sure proper ESD precautions are
observed. The ESD grounding termination point is located on
the door latch bracket of the GPS cabinet.

• Wear grounded antistatic wrist straps when handling all

circuit packs. The wrist strap must be in contact with the skin
and is not to be worn over clothing.

Advertising