Please remove the plate before drilling any holes, Critical power – GE Industrial Solutions TLE Series 225-500 Installation Guide User Manual

Page 19

Advertising
background image

Critical Power

Modifications reserved

Page 19/54

GE_UPS_ISG_TLE_SUL_M22_M50_1US_V010.docx

Installation Guide TLE Series 225 - 500 UL S1

TLE Series 225 - 500 Openings for input and output cable connections

Fig. 4.4.1-4 TLE Series 225 & 250 – Opening on top of the cabinet for input and output cables connections

Fig. 4.4.1-5 TLE Series 400 & 500 – Opening on top of the cabinet for input and output cables connections

Fig. 4.4.1-6 TLE Series 225 & 250 – Opening on the bottom of the cabinet for input & output cables connections

Fig. 4.4.1-7 TLE Series 400 & 500 – Opening on the bottom of the cabinet for input & output cables connections

TLE Series 225 - 500 openings are provided on the top (*) and the bottom (*) of the UPS for the
connection of input and output cables.

Pay attention to the position of these openings, when choosing the placement of the UPS.
These openings are covered with a protective plate.

*) Please remove the plate before drilling any holes.

Utility input
Output load

Battery

9.85 "

250 mm

44.10"

1120 mm

0.99 "

25 mm

TLES_UL_225-

250_S1_UPS view t

op_01US

FRONTAL SIDE

1 "

25 m

m

29.5

3 "

750 m

m

34.0

6 "

865 m

m

Utility input

Output load

Battery

10.83 "

275 mm

63.78"

1620 mm

1.38 "

35 mm

TLES_UL_400-500_

S1_UPS view top_0

1US

FRONTAL SIDE

1 "

25

mm

29.5

3 "

750 m

m

34.0

6 "

865 m

m

FRONTAL SIDE

8.27 "

210 mm

TLES_UL_225-25

0_S1_UPS view bot

tom_01US

Utility input

Load output

Battery

29.53 "

750 mm

34.0

6 "

865

mm

44.10"

1120 mm

0.99 "

25 mm

1.97 "
50 mm

FRONTAL SIDE

9.73 "

247 mm

TLES_UL_400-500_

S1_UPS view bottom

_01US

Utility input

Load output

Battery

29.10 "

739 mm

34.06

"

865

mm

63.78"

1620 mm

2.05 "

52 mm

2.68 "
68 mm