3 control bus cable location, Control bus cable location, Access to the control bus connection – GE Industrial Solutions TLE Series 225-500 Installation Guide User Manual

Page 45: Control bus cables connection, Critical power, View electronic module on intermediate unit, 12 ep o ep o

Advertising
background image

Critical Power

Modifications reserved

Page 45/54

GE_UPS_ISG_TLE_SUL_M22_M50_1US_V010.docx

Installation Guide TLE Series 225 - 500 UL S1

4.9.3 Control bus cable location

WARNING !

This installation must be verified by trained personnel before the initial start-up.
ENSURE THAT THE UPS INSTALLATION IS COMPLETELY POWERED DOWN.

Fig. 4.9.3-1 TLE Series 400 & 500

View electronic module on intermediate unit

Fig. 4.9.3-2 TLE Series 400 & 500

View electronic module on intermediate unit

Access to the control bus connection

The communication bus cable connectors are placed on the two boards P13/P14 – IM0022 – Bus
Interface Board
(see Fig. 4.9.3-1 and 4.9.3-2).

Fig. 4.9.3-3 View electronic module on intermediate unit

Control bus cables connection

Plug the cables J1A – J2A (1/2/3/4/5) and J1B –
J2B
(1/2/3/4/5)
on the connectors J1A – J2A and
J1B – J2B placed on the two boards P13/P14
IM0022
Bus Interface Board
.

Fix the communication bus cables J1A – J2A
(1/2/3/4/5)
and J1B – J2B (1/2/3/4/5) with the
provided cable clamps “A”.

TLES_UL_22

5-250_S1_

RPA conne

ction_01

Q1

I ON

0

OF

F

Q2

I ON

0

OF

F

1

2

EP

O

EP

O

-

+

TLES_320-

400_S1_RP

A connect

ionE_01

1

2

EP

O

EP

O

-

+

0 Off

I O

N

0 Off

I O

N

Q1

Q2

J2

J1

J2

J1

A

B

J1B/1

J1A/2÷5

J1A/1

J1B/2÷5

-

+

EP

O

EP

O

TLES_160-

400_S1_R

PA connec

tion_02

Advertising