GE Industrial Solutions TLE Series 225-500 Installation Guide User Manual

Page 37

Advertising
background image

Critical Power

Modifications reserved

Page 37/54

GE_UPS_ISG_TLE_SUL_M22_M50_1US_V010.docx

Installation Guide TLE Series 225 - 500 UL S1

4.8.3 TLE Series 400 & 500 - Power connection with Common Input Utility

Fig. 4.8.3-1 TLE Series 225 & 250 - Power connections Common Input Utility

Power connection cables are connected to bus bars using M10 bolts.
The bolts of the connection cables must be tightened with a torque wrench at 355 Lb-in / 40 Nm.

Common Input Utility - Rectifier / Bypass

L1-1

Rectifier + Bypass Phase A (L1)

L2-1

Rectifier + Bypass Phase B (L2)

N

Neutral

L3-1

Rectifier + Bypass Phase C (L3)

PE

Ground

NOTE !

The interconnection links BR1, BR2 and BR3 (option) on the input bus bars MUST
REMAIN CONNECTED (see Fig. 4.8.3-2)
.

Output Load

L1

Load phase A (L1)

L2

Load phase B (L2)

L3

Load phase L3

N

Neutral

Ground

External Battery connection

+

Positive pole of the battery

UPS PARALLELED ON THE SAME BATTERY:

This configuration is not possible for UPS Parallel
System TLE Series 225 & 250.

Before closing the “External Battery Fuses”
, verify for
correct polarity of the battery connection
.

-

Negative pole of the battery

PE

Battery cabinet ground

NOTE !

To meet standards concerning electromagnetic compliance, the connection between the
UPS and external Battery
must be done by using a shielded cable or suitable shielded (steel)
conduit!
This UPS is only designed to operate in a wye-configured electrical system with a solidly
grounded neutral.
If the UPS is equipped with an input bypass transformer, the secondary of the transformer
must be wye-configured with neutral solidly grounded.

INTERCONNECTIONS LINKS

BR1, BR2 and BR3

MUST REMAIN CONNECTED

Q2

Q1

TLES_UL_4

00-500_S1

_UPS conn

ection comm

on_Top_01

US

+

-

PE

PE

N

Utility Neutral
Load Neutral

Typical installation

using common NEMA

two hole lugs

Load

Typical installation using

common NEMA two hole lugs

PE

PE

(Use for top entry cables)

L3

L2

L1

L3-1

L2-1 L1-1

1

Rectifier &

Bypass

Utility

B

R2

BR3

BR1

(Use for bottom entry cables)

PE

Attention:

Use only as additional PE

!

Position of the cover protection

with top cable entry

Position of the
cover protection with
bottom cable entry