Installation Guide TLE Series 225 - 500 UL S1

Installation notices in case of power connection with Dual Input Utility

Fig. 4.8.4-2 TLE Series 400 & 500 - Interconnection links BR1, BR2 and BR3


NOTE !

For separate Bypass and Rectifier input configuration, the interconnection links
BR1
, BR2 and BR3 MUST BE REMOVED (see Fig. 4.8.4-2).


+

-

PE

L3-1

L1-2

L2-2

(with bottom cable entry)

PE

N

Utility Neutral
Load Neutral

L3-2

Load

2 - Bypass Utility

1

Rectifier

Utility

PE

PE

(with top cable entry)

L3

L2

L1

Q2

Q1

TLES_UL_4

00-500_S1

_UPS BR1-2

-3_01US

L2-1

L1-1

BR1, BR2 and BR3
MUST BE REMOVED

!

BR1

BR2

BR3

PE

Attention:

Use only as
additional PE

36

37

38

38

37

36