Control bus cables routing, Ups 1, Ups 3, 4, 5, 6 – GE Industrial Solutions TLE Series 225-500 Installation Guide User Manual

Page 46: Ups 2, Critical power, I on 0 o ff, I on 0 o ff 1 2 e po e po, Ep o ep o

Advertising
background image

Critical Power

Modifications reserved

Page 46/54

GE_UPS_ISG_TLE_SUL_M22_M50_1US_V010.docx

Installation Guide TLE Series 225 - 500 UL S1

Fig. 4.9.3-4 TLE Series 225 & 250 - Control Bus cable routing and connection

Fig. 4.9.3-5 TLE Series 400 & 500 - Control Bus cable routing and connection

Control bus cables routing

Place and fix the cables J1A – J2A (1/2/3/4/5) and J1B – J2B (1/2/3/4/5) inside the UPS cabinets in
the position illustrated in the drawing Fig. 4.9.3-4 and 4.9.3-5.

NOTE !

Pay attention when cabling and routing the communication bus cables J1A – J2A
(1/2/3/4/5)
and J1B – J2B (1/2/3/4/5) inside the UPS cabinet.
In case one unit must be removed from the Parallel System
, the communication
bus cables must be taken out the UPS cabinet WITHOUT DISCONNECTING THEM
from the two boards “P13/P14 – IM0022 – Bus Interface Board”.

For reliability reasons the cables J1A – J2A (1/2/3/4/5) and J1B – J2B (1/2/3/4/5) connecting the units
should be run in separated protected conduits (as indicated in Fig. 4.9.3-3) separated from the
power cables.

It is important that the cable J1A – J2A (1/2/3/4/5) must be the same length as cable J1B – J2B
(1/2/3/4/5)
.

WARNING !

Connection and commissioning of an additional UPS to an existing Parallel System
must be performed by a service engineer from of your Service Center
.

TLES_UL_225-

250_S1_R

PA connec

tion_03US

Q1

I ON

0

O

FF

Q2

I ON

0

O

FF

1

2

E

PO

E

PO

-

+

Q1

I ON

0

O

FF

Q2

I ON

0

O

FF

1

2

E

PO

E

PO

-

+

J1B/1

J1A/1

UPS 1

J2

J1

J2

J1

A

B

J1B/1

J1A/2÷5

J1A/1

J1B/2÷5

UPS 2/3/4/5

J2

J1

J2

J1

A

B

J1B/1

J1A/1

UPS 1

J1A/2÷5

UPS 3, 4, 5, 6

J1B/2÷5

UPS 2

UPS 3, 4, 5, 6

J1B/2÷5

J1A/2÷5

J2

J1

J2

J1

A

B

J1B/1

J1A/2÷5

J1A/1

J1B/2÷5

UPS 2/3/4/5

J1B/1

J1A/1

J2

J1

J2

J1

A

B

J1B/1

J1A/1

UPS 1

UPS 1

TLES_UL_40

0-500_S1_

RPA connect

ion_03US

Q1

1

2

I ON

0

O

FF

Q2

I ON

0

O

FF

EP

O

EP

O

- +

Q1

1

2

I ON

0

O

FF

Q2

I ON

0

O

FF

- +

UPS 2

Advertising