Installation – Teledyne 3010TB - Split architecture trace oxygen analyzer User Manual
Page 17
Oxygen Analyzer
Part I: Control Unit
Part I: 3-1
Teledyne Analytical Instruments
Installation
Installation of Model 3010 Analyzers includes:
1. Unpacking, mounting, and interconnecting the Control Unit and
the Analysis Unit
2. Making gas connections to the system
3. Making electrical connections to the system
4. Testing the system.
This chapter covers installation of the Control Unit. (Installation of the
Analysis Unit is covered in Part II of this manual.)
3.1
Unpacking the Control Unit
The analyzer is shipped with all the materials you need to install and
prepare the system for operation. Carefully unpack the Control Unit and
inspect it for damage. Immediately report any damage to the shipping agent.
3.2
Mounting the Control Unit
The Model 3010TB Control Unit is for indoor/outdoor use in a general
purpose area. This Unit is NOT for any type of hazardous environments.
The standard model is designed for indoor/outdoor mounting. Figure 3-
1 is an illustration of a Model 3010TB standard Control Unit front panel and
mounting brackets located-two at the top and two at the bottom of the units
frame. Drawing number D-64808, at the back of this manual, contains an
outline mounting diagram.