Teledyne LeCroy PETracer Summit and Summit T2-16 PCIe User Manual User Manual

Page 43

Advertising
background image

Summit User Manual

Chapter 3: Installation and Setup

Teledyne

LeCroy

35

Connections Overview for Gen2 MidBus Probe

Use a 1-pod or 2-pod setup depending on the lane width of the recording:

For x16 recordings, use the 2-pod setup.

For all other lane width recordings, use a one-pod setup.

Use the iPass Y-cables to connect the probe data connectors on the Analyzer to the
MidBus pod(s).
On the other side of the pod, connect the MidBus probe assembly.

Connect the header on the MidBus probe assembly to the MidBus footprint on the
System Under Test (host platform/root complex). The following picture shows two midbus
footprints, with one connected to the MidBus probe assembly:

Connection Procedure

To connect the Summit T2-16 to the System Under Test (host platform/root complex):

Step 1 Connect the MidBus pods to the Analyzer using the iPass Y-cables.

Step 2 Connect the MidBus probe assemblies to the MidBus pods.

Step 3 Connect the MidBus probe assemblies to the MidBus footprints on the system

under test.

Step 4 Connect external reference clock signal to Mid-Bus External Clock In on

Mid-Bus probe pod, using external reference clock cable. For x16, you
need to chain the pods.

Advertising