Setting complex "wait for" conditions – Teledyne LeCroy SAS Suite User Manual User Manual

Page 262

Advertising
background image

Version 6.25

SASSuite User Manual

252

LeCroy Corporation

Setting Complex "Wait For" Conditions

The Generation Options dialog lets users define complex "Wait For" events and assign a
letter value ("A" through "F") to the definition so that you can refer to the definition by letter
instead of by textual name.

Once a letter value has been assigned to an event, the letter is referred to in your
generation script using the following command syntax:

Wait_For {WF_REC_RESOURCES_OUTPUT_A}

where "A," in this case, is the defined condition.

Setting

Conditions

with the

Generation

Options

Dialog

To set a complex condition, open the Generation Options dialog:

Step 1 Select Generate > Generation Options from the menu. The

Generation Options dialog opens. The Generation Options
dialog looks very similar to the Recording Rules dialog:

Step 2 Click the New Events button and select an event from the menu.

The selected event should appear in the Available Events area
along the left side of the dialog box.

Step 3 Drag the new event button to the Global State cell.

Advertising