Important caution important – Yokogawa ADMAG CA User Manual

Page 12

Advertising
background image

4.INSTALLATION

IM 1E8B0-01E

4-3

(6) Liquid Sealing Compound

Please give attention in using Liquid Sealing Compound to the piping,
because it brings bad influences to measurement by flowing out and cover
the surfaces of earth-ring.

(7) Service Area

Please select the location where there is enough area to service installing, wiring,
overhaul,etc.

(8) Bypass Line

It is recommended to install the Bypass Line to facilitate maintenance and zero adjust-
ment.

Block valve

Block valve

Bypass valve

(9) Supporting the Flowmeter

Please avoid to support only the flowmeter, but fix pipes at first and support
the flowmeter by pipes to protect the flowmeter from forces caused by
vibration,shock, expansion and contraction through piping.

(10)Piping Condition

The piping should be designed so that a full pipe is maintained at all times
to prevent loss of signal and erroneous reading.

Please design the piping that a fluid is always filled in the pipes. The Vertical Mounting
is effective for fluids that is easily separate or slurry settles within pipes.

In this case, please flow a fluid from bottom to up.

(GOOD)

(BAD)

(GOOD)

(BAD)

h

h

h > 0

h > 0

Horizontal mounting

Vertical mounting

IMPORTANT

CAUTION

IMPORTANT

Advertising