KROHNE IFC 110 Converter User Manual

Page 78

Advertising
background image

Sect. 7.7

Part C Special applications, functional checks, service, and order numbers

78

IFC 110 F

05/2003


Checking the setpoint reading
1)

Switch on the power supply and allow at least 15 minutes for ”warming up”.

2)

Turn switch D (GS 8 A front panel) to ”0”.

3)

Adjust zero to 0 or 4 mA with the 10-turn potentiometer P (GS 8 A front panel), depending
on the setting in Fct. 1.05, deviation <± 10 µA.

4)

Calculate the position of switch Y and displayed setpoints ”I” and ”f”.

4.1) X

=

Q

100%

× K

GK

× DN²

Q

100%

full-scale range (100%) in unit volume V per unit time t

GK

flow sensor constant, see instrument nameplate

DN

meter size DN in mm, not inches, see instrument nameplate

t time in seconds (sec.), minutes (min.) or hours (h)
V unit

volume

K

constant according to the following table

t

Sec min h

V

liters

25 464

424.4

7.074

25 464 800

424 413

7 074

US Gallons

96 396

1 607

26.78

4.2)

Determine position of switch Y: use table (GS 8 A front panel) to determine value Y which
comes closest to factor X and meets condition Y

X.

4.3)

Calculate setpoint reading ”I” for current output: I

=

I

0%

+

Y
X

(I

100%

- I

0%

) in mA

I

0%

current (0/4mA) at 0% flow rate

I

100%

current (20mA) at 100% flow rate

4.4)

Calculate setpoint reading ”f” for pulse output: f =

× P

100%

in Hz

Y
X

P

100%

pulses per second (Hz)

at 100% flow rate

5)

Turn switch D (GS 8 A front panel) to ”+” or ”-” (forward/reverse flow).

6)

Set switch Y (GS 8 A front panel) to the value determined as described above.

7)

Check setpoint readings I and f, see items 4.3 and 4.4 above.

8)

Deviation < 1.5 % of setpoint. If higher, replace signal converter, see Section 8.7.

9)

Linearity test: set lower Y values, readings will drop in proportion to the calculated
values for Y.

10)

Switch off power supply after completing the test.

11)

Disconnect the GS 8 A.

12)

Re-assemble in reverse order (items 2 to 1 ”in connection of GS 8A”).

See also illustration in Section 8.1 and 8.7.

13)

The system is ready for operation after the power supply is switched on again.

Example: see next page.

Advertising