Powering up, Powering up procedure, Overview of front panel – West Control Solutions 8700+ User Manual

Page 40: 5 powering up

Advertising
background image

1

/

4

-DIN,

1

/

8

-DIN &

1

/

16

- DIN Controllers & Indicators - Product Manual


59305, Issue 7

– March 2014

Powering Up

Page 35

5 Powering Up

WARNING:

ENSURE SAFE WIRING PRACTICES ARE FOLLOWED

The instrument must be powered from a supply according to the wiring label on the side of
the unit. The supply will be either 100 to 240V AC, or 24/48V AC/DC powered. Check
carefully the supply voltage and connections before applying power.

CAUTION:

When powering up for the first time, disconnect the output connections.

Powering Up Procedure

At power up, a self-test procedure is automatically started, during which all LED segments
and indicators are lit. At the first power up from new, or if the option modules are changed,
  will be displayed, indicating configuration is required (refer to section 6). At all
other times, the instrument returns to operator mode once the self-test procedure is
complete.

Overview Of Front Panel

The illustration below shows a typical instrument front panel. Refer to the following table

Typical LED functions for a description of the front panel indicators. Each model in the range
will vary slightly from the example shown.

Figure 37.

Typical front panel and keys

Reset or Auto/Manual Select Key

Lower Key

Raise Key

Function Key

Advertising
This manual is related to the following products: