Joint Cementing Procedure

All cementing of joints should be done according to the

specifications outlined in ASTM D 2855.

1. Measure and cut vent pipe to desired length.

2. Debur and chamfer end of pipe, removing any ridges or

rough edges. If end is not chamfered, edge of pipe

may remove cement from fitting socket and result in a

leaking joint.

3. Clean and dry surfaces to be joined.

4. Test fit joint and mark depth of fitting on outside of pipe.

5. Uniformly apply a liberal coat of PVC primer for PVC or

use a clean dry cloth for ABS to clean inside socket

surface of fitting and male end of pipe to depth of fitting

socket.

6. Promptly apply solvent cement to end of pipe and inside

socket surface of fitting. Cement should be applied

lightly but uniformly to inside of socket. Take care to

keep excess cement out of socket. Apply second coat

to end of pipe.

NOTE: Time is critical at this stage. Do Not allow Primer to

dry before applying cement.

7. Immediately after applying last coat of cement to pipe,

and while both inside socket surface and end of pipe

are wet with cement, forcefully insert end of pipe into

socket until it bottoms out. Turn PVC pipe 1/4 turn during

assembly (but not after pipe is fully inserted) to distribute

cement evenly. Do not turn ABS or cellular core pipe.

NOTE: Assembly should be completed within 20 seconds

after last application of cement. Hammer blows should not

be used when inserting pipe.

8. After assembly, wipe excess cement from pipe at end

of fitting socket. A properly made join will show a bead

around its entire perimeter. Any gaps may indicate an

improper defective assembly due to insufficient solvent.

9. Handle joints carefully until completely set.

DANGER OF EXPLOSION!

Fumes from PVC glue may ignite during system check.

Allow fumes to dissipate for at least 5 minutes before

placing unit into operation.

DANGER

FIGURE 17

* See Table 4 for allowable pipe.

Piping Suspension Guidelines

NOTE: Isolate piping at the point where it exits the outside wall or
roof in order to prevent transmission of vibration to the structure.

SCHEDULE 40

PVC − 5’

all other pipe* − 3’

Wall

e

d

i

s

t

u

o

e

d

i

s

n

i

24" maximum
3/4" minimum

Wall Thickness Guidelines

insulation

(if required)

CHIMNEY

OR GAS

VENT

(Check sizing

for remaining

appliance)

FURNACE

(Removed from

from common
vent system)

WATER

HEATER

OPENINGS

(To Adjacent

Room)

If this gas furnace replaces a furnace which was
commonly vented with another gas appliance,
the size of the existing vent pipe for that gas ap-
pliance must be checked. Without the heat of the
original furnace flue products, the existing vent pipe
is probably oversized for the single water heater or
other appliance. The vent should be checked for
proper draw with the remaining appliance.

FIGURE 18

REPLACING FURNACE THAT

WAS PART OF A COMMON

VENT SYSTEM

NOTE: A sheet metal screw may be used to secure the

intake pipe to the connector, if desired. Use a drill or self

tapping screw to make a pilot hole.

Venting Practices