Chapter six: operating your rpcm – Lyntec RPCM User Manual

Page 27

Advertising
background image

139-0498-01.27

27

Chapter Six--Operation

Chapter Six: Operating your RPCM

Figure 6-1

Using the built-in web page

To operate the RPC using the built in web page, select the
control tab from the top of the page. Once on the CONTROL
page, simply click each breaker for individual control. Or, click a
zone for zone control. “All Breakers ON” and “All breakers OFF”
commands can also be executed from this page.

Using a secondary controller

For DMX and sACN follow the manufacturer’s instructions
using the DMX addresses entered in the NETWORK page ( see
page 16).

TCP/IP commands are in Appendix A.

Advertising