6 unpacking and parts list, 1 unpacking, 2 inventory of parts – CiDRA GVF-100 Gas Volume Fraction Monitoring System User Manual

Page 16: Unpacking and parts list -1, 1 unpacking -1 6.2 inventory, Parts -1, Table 1 sonartrac, Gvf-100 parts list -1, Unpacking and parts list

Advertising
background image

Copyright © 2006 CiDRA Corporation

Page 6-1

20639-01 Rev 03

6

UNPACKING AND PARTS LIST

6.1 Unpacking

The SONARtrac

TM

GVF-100 will typically be packaged in three

shipping containers. One box will contain the sensor band and sensor
cover assemblies, and installation hardware; the second box will
contain the transmitter assembly and installation hardware; and the
third box will contain the sensor to transmitter cable assembly.

Note:

Cidra Corp. recommends the original packing materials be

saved in the event that the system is removed or relocated.

CAUTION

Use care in unpacking and transporting system. Improper
handling may result in damage to system components.

Whenever possible use the original packing materials to transport the
system to the installation site to minimize the likelihood of damage.

WARNING

Static discharge may occur when handling sensor band and
packing material. Remove from packing materials when entering
hazardous areas. Always keep the sensor band shorting plug
installed until sensor band is installed on the process pipe.

6.2 Inventory

of

Parts

Table 1 lists the parts contained in the shipping containers.

Description

SONARtrac

TM

GVF-100 Gas Volume Fraction Process Monitoring

System

Sensor Head Cable

Installation Hardware

Sealant, Joint and Thread, PTFE Paste, 3.5 oz Tube – included with
fiberglass sensor cover assemblies

Gauge, Spring Gap (used for sensor installation) - included with sensor
band assembly

Model GVF-100 Gas Volume Fraction Process Monitoring System
Installation & Startup Manual

Kit, Parts, Pole Mounting (Option)

Sensor Rain Guard Kit for vertical installations (Option)

Table 1

SONARtrac

TM

GVF-100 Parts List

Advertising