Chapter 4: installation, Site requirements, Unpacking the drive components – ElmoMC Gold Line Digital Servo Drives-Gold Trombone User Manual

Page 23: Chapter 4, Installation

Advertising
background image

Gold Trombone Installation Guide (EtherCAT and CAN)

Installation

MAN-G-TROIG-EC (Ver. 1.604)

www.elmomc.com

23

Chapter 4:

Installation

The Gold Trombone must be installed in a suitable environment and properly connected to its
voltage supplies and the motor.

4.1. Site Requirements

You can guarantee the safe operation of the Gold Trombone by ensuring that it is installed in
an appropriate environment.

Feature

Value

Ambient operating temperature

0 °C to 40 °C (32 °F to 104 °F)

Maximum non-condensing humidity 90%

Maximum altitude

2,000 m (6562 feet)

Operating area atmosphere

No flammable gases or vapors permitted in area

Models for extended environmental conditions are available.

Caution: The Gold Trombone dissipates its heat by convection. The maximum
ambient operating temperature of 40 °C (104 °F) must not be exceeded.

4.2. Unpacking the Drive Components

Before you begin working with the Gold Trombone, verify that you have all of its components,
as follows:

The Gold Trombone servo drive

The Elmo Application Studio (EAS) software and software manual

The Gold Trombone is shipped in a cardboard box with Styrofoam protection.
To unpack the Gold Trombone:

1.

Carefully remove the servo drive from the box and the Styrofoam.

2.

Check the drive to ensure that there is no visible damage to the instrument. If any damage

has occurred, report it immediately to the carrier that delivered your drive.

Advertising