Chapter 8: powering up, Initializing the system, Chapter 8 – ElmoMC Gold Line Digital Servo Drives-Gold Tuba User Manual
Page 79: Powering up, Pow ering up
Advertising
![background image](/manuals/558355/79/background.png)
Gold Tuba Installation Guide
MAN-G-TUBIG-EC (Ver. 1.201)
|Initializing the System
79
Chapter 8:
Pow ering Up
After the Gold Tuba is connected to its device, it is ready to be powered up.
Caution:
Before applying power, ensure that the DC supply is within the specified range
and that the proper plus-minus connections are in order.
8.1. Initializing the System
After the Gold Tuba has been connected and mounted, the system must be set up and initialized.
This is accomplished using the EAS II, Elmo’s Windows-based software application. Install the
application and then perform setup and initialization according to the directions in the EAS II User
Manual.
Advertising