Mapping the real station structure in the »PLC Designer«

4.4

Configuring I/O modules on the CANopen bus coupler module

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Setting sync generation
Sync generation is required if ...

• at least one PDO with sync-controlled processing is used on the bus;
• the applications are to run in synchronism in several field devices;
• Motion devices are to be operated on the fieldbus.

Activate the sync generation:

16. Double-click the "CANopen_Manager_MC_CAN2" device in the device view to open its

settings.

17. On the CANopen_Manager tab:

Activate sync generation option.

Set sync cycle time in the Cycle Period input field.

Tip!

• With a correct configuration and after going online and starting the PLC, all modules in

the device view are marked with the symbol.

• In the event of an error, i.e. if the configuration deviates from the physical arrangement,

the corresponding modules ar marked with the symbol.